Our Archives

Call 09159097300 or for any enquiries.

Project Topic:

RELIABILITY ANALYSIS ON WIND TURBINE

Project Information:

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 57 ::   Attributes: EXPERIMENT ::   193 people found this useful

Project Body:

CHAPTER ONE

1.0 Introduction

Modern wind turbines are complex aerodynamic, mechanical, electrical and electronic machines incorporating sophisticated control systems. Wind turbines have been erected in increasing numbers in off shore and onshore in India, Germany and Denmark. The wind turbine played a particularly prominent part in production of electricity to manage the demand.

            The installation of wind turbines (WT) is booming. During 2016 more than 54 GW of wind capacity was erected worldwide. All new WT as well as the existing ones (about 486 GW in total) have to be operated and maintained carefully (WWEA, 2017).

            According to recent studies, operation and maintenance (O&M) accounts for a share between 25% and almost 40% of levelized cost of energy (LCOE) (Hobohm, et al., 2015). The energy yield itself is also heavily affected by the success of O&M-strategies. Thus, optimization of O&M is of high importance for a further reduction of LCOE. Before an optimization can start, one has to know the current status and prioritize further actions. In recent years, several initiatives have begun to collect data on the performance and reliability of WT onshore and offshore and to publish the results in various journals and conferences. Although the objectives of the various initiatives are similar, each initiative follows a different approach and the results are hence difficult to compare.

Aim And Objectives Of The Study

The study aimed to carry out a reliability analysis on wind turbine. The objectives of the study are:

  1. To carry out a failure modes and effects analysis (FMEA) for Wind Turbines
  2. To determine various types of wind turbine failure modes
  3. To identify the factors affecting the failure modes and effects analysis (FMEA) for Wind Turbines
  4. To recommend ways to improve the reliability of wind turbine

1.2 Structure of the report   

The introductory part of the project will cover the background to the reliability analysis on wind turbine. The literature review will cover for both the related research and the theoretical aspect of the study. The methodology will be based on FMEA. The result of the analysis of the FMEA will be discussed and concluded.


Get The Complete Project »

Project Department:

MORE MECHANICAL ENGINEERING FREE PROJECT TOPICS AND RESEARCH MATERIALS FOR FINAL YEAR STUDENTS

Instantly Share this Project On Social Media:

CLOSELY RELATED MECHANICAL ENGINEERING FREE PROJECT TOPICS AND RESEARCH MATERIALS FOR FINAL YEAR STUDENTS

DESIGN A ND FABRICATION OF A DUST EXTRACTOR

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 25 ::   Attributes: DOCUMENTATION  ::   6458 engagements

ABSTRACT Man’s imp act on global environment system especially in the area of dust extraction is now at a scale where it is disrupting. These dust extractors varies in major ways. The enviro...Continue reading »

DESIGN AND FABRICATION OF A PILOT PRODUCTION PLANT FOR PAINTS (EMULSION AND TEXCOAT)

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 30 ::   Attributes: DOCUMENTATION  ::   4452 engagements

ABSTRACT The concept of this project is to actualize a practical way of paint production using a locally design mixing machine which is design to meet a low cost and high standard paint. The pr...Continue reading »

CONSTRUCTION OF A MOBILE REFRIGERATOR FRIDGE

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 40 ::   Attributes: DOCUMENTATION  ::   5587 engagements

ABSTRACT This write up focuses attention on a detailed report and account on the process of construction and formulation of plan for the actual and physical realization of the construction of the p...Continue reading »

THE DESIGN AND FABRICATION OF MECHANCIAL LAWN MOWER

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 40 ::   Attributes: DOCUMENTATION  ::   6245 engagements

ABSTRACT Mechanical engineering department of the named institute has many non operational machines sequel to this fact maintenance which resulted to non development and non maintenance of the ins...Continue reading »

REPAIR AND MAINTENANCE OF A FAULTY DEEP FREEZER IN THE DEPARTMENT OF MECHANICAL ENGINEERING

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 20 ::   Attributes: DOCUMENTATION  ::   4213 engagements

ABSTRACT Mechanical Engineering Department of the Institute of Management and Technology has many non – functional machines. This is caused as a result of poor maintenance culture, which in tu...Continue reading »

CONSTRUCTION OF AN ELECTRICAL STOVE WITH THREE-OVEN APARTMENT

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 25 ::   Attributes: DOCUMENTATION  ::   4897 engagements

ABSTRACT This project is concern about the construction of an electrical stove with three oven apartment is described in his project. It was carried out in order to solve the problem often encount...Continue reading »

What are you looking for today?

TESTIMONIALS:

  • 1. Jayone from FPA said " I had a wonderful experience using UniProjectMaterials,though they did not deliver the material on time, but the content had good quality. I recommend UniProjectMaterials for any project research work.".
    Rating: Very Good
  • 2. Mugisha R from B.U, UGANDA said "Wow, this is great, your materials has helped me alot. Many blessings. I will inform my friends. Thanks. ".
    Rating: Very Good
  • 3. Nwachukwu Ruth Chinyerr from Michael okpara university of Agriculture,umudike said "I really appreciate this. Materials like this are good guides to writing a researchable project.".
    Rating: Good
  • 4. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 5. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 6. Mohammed A.B from Veterinary Laboratory, Zanzibar ,Tanzania said "You are doing good job to assists in research. God bless you.".
    Rating: Very Good

Project Information

Format:MS WORD
Chapter:1-5
Pages:57
Attribute:EXPERIMENT
Price:₦3,000
Get The Complete Project »

Best Selling Projects

Our Archives