AN INVESTIGATION INTO THE EFFECTS OF DESIGN ERROR ON THE FINAL COST OF A PROJECT IN NIGERIA

Project Information:

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 111 ::   Attributes: Questionnaire, Data Analysis ::   5,807 people found this useful

Project Body:

ABSTRACT

This research project investigated the effects of design error on the final cost of a project in nigeria. It is a key issue, because many projects in Nigeria have inadequacies in the plans and specifications which have been major causes of changes to the contract. There have been extreme examples of design errors such as numerous building collapses in Nigeria - projects that have wrought disaster after the construction are completed. One or two major errors that can be corrected with only initial cost considerations and little effect on the schedule finally ends up causing major impacts on the final cost and schedule growth. These dilemmas place an increasing pressure on stakeholders in the construction industry to search for solutions that will minimize error in designs so as to maintain estimated construction cost and time while maximizing its quality. One hundred and twenty selected project clients, consultants and contractors in Imo state of Nigeria were issued well structured questionnaires to elicit responses on the investigation of the effect of design error on the final cost of a project, and the analysis of data was done using pie chart. The research study revealed that design error affects final cost of a construction project causing cost overrun on cost and time. Additionally, the research revealed that the issue of cost and time impacts on project construction could be managed by using construction recognized and accepted methodologies which identifies and quantifies the overall impact to the project. The research concludes that unclear scope of work or change in scope of work; time and inexperience of the designer and inaccuracy of the design documents are the major causes of design error on construction projects in Nigeria. In this regard the paper recommends that the consultants’ experience, lack of design reviews, design management experience, awareness of changes in standards, communications and availability of information, inconsistent decision making, and lack of coordination between disciplines, lack of planning and inspection of project and unclear or ambiguous requirements for design specifications should be worked upon by the stakeholders concerned in order to prevent the occurrence of design error in construction projects in Nigeria.

 

 

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE STUDY

When asked to define "design error," not all disciplines in the construction process agree on a common definition. Depending on which discipline you address, the owner, the designer or the contractor, there will be a common understanding surrounded by varied conclusions, "a mistake." From the basic definitions of "design" and "error" we conclude that a design error is a deviation from a drawing or specification, also including omissions and ambiguities. It is the seriousness of this error that must be considered to determine its consequences on the overall outcome of the project. One of the most important challenges facing management today is controlling the ball too frequent final cost and schedule overruns that effect the construction industry (Diekmann and Thrush, 1986). One of the major issues to control growth in project final costs and time is the reduction of design errors.

The owner, designer and contractor all have different interests in, or uses for the design of a facility. But what they do share is the commitment to complete the project safely and within a given budget and completion time. There are many initiatives being conducted to control the growth of final cost and schedule within the construction industry.

The major issue is "accuracy of the drawings," or the number of design errors, omissions and ambiguities within the plans and specifications that affect the quality of the facility. Inadequacies in the plans and specifications are the major causes of changes to the contract So much emphasis is placed on the issue of time and final cost that quality takes a back seat .The quality of the project depends on the conformance of the objectives and requirements from the owner. An informative quality management technique will provide an agreement to procedures and definitions among the principle parties for the project. Since design errors have an impact on the outcome of the effectiveness of the contractor's effort on the project it is essential that all parties determine what the definition of a design error should be.

 

1.2 STATEMENT OF THE PROBLEM

Design errors indicate the total design in-effectiveness of a project. Major design quality problems occur during construction when errors, omissions and ambiguities in plans and specifications become evident (Davis and Ledbetter, 1987). This statement directs that the inadequacies in the plans and specifications are the major causes of changes to the contract. There have been extreme examples of design errors such as numerous building collapses in Nigeria - projects that have wrought disaster after the construction are completed. These are examples of design errors that escaped the close scrutiny of all parties. One or two major errors that can be corrected with only initial cost considerations and little effect on the schedule can impact projects. The projects that really suffer are those with many small errors (design, rework or change of scope) which when finally added up causes major impacts on the final cost and schedule growth. Through Davis and Ledbetters research it was determined that "accuracy of the design documents" was the most critical of the criteria used in the initial evaluation of design effectiveness. This accuracy was further described as the concern for the frequency and impact of errors in the specifications and drawings. This is due to the fact that the drawings and specifications are the most "readily identifiable outputs of the design process." It is even more important that the quality control of designs be addressed during the planning phase and closely monitored during the construction phase.

Design errors of a project have been an issue that has been misconstrued. The attitude towards design errors in the country can now be best described as tardy and unsatisfactory.

 

1.3 AIM AND OBJECTIVES OF THE STUDY

1.3.1 AIM

The main aim of the study is to investigate how design errors can affect the final cost of a project.

 

1.3.2 OBJECTIVES

The specific objectives are:

  1. To determine what constitutes a design error.
  2. To examine the contributing factors to design errors in Nigeria.
  3. To examine how these factors can affect final cost of a project.
  4. To proffer solutions on how to minimise cost of construction projects in Nigeria.

 

  1. RESEARCH QUESTIONS
  1. What are design errors in construction projects?
  2. What makes or contributes to a design error?
  3. What are the factors that lead to design errors?
  4. What effect can design errors have on final cost and growth of a project?
  5. Who is responsible for design error?

 

 

 

 

 

1.5 HYPOTHESIS FORMULATION

1. H0: Design error affect final cost of a building construction project.

H1: Design error does not affect final cost of a building construction project.

2. H0: Design errors causescost overrun in a building construction project.

H1: Design errors does not causecost overrun in a building construction project.

3. H0: Additional work causes additional cost in a building construction project due to design errors.

H1: Additional work does not cause additional cost in a building construction project due to design errors.

 

 

1.6 SIGNIFICANCE OF THE STUDY

This study gives a clear insight into the various ways in which contractors in the construction companies in Nigeria can maximise profits and reduce final cost through effective and efficient contract planning and management. The study also gives a clear insight into the various effects of design errors on the final cost of a project. The findings and recommendations of the researcher will help in building a strong and better project management guideline for contractors in Nigeria.

Also, the study of the investigation of the effect of design errors on the final cost of a project will provide results that will offer the following benefits:

  1. Establish the scope and methodology of design functions performed by Architectural firms for the benefit of the entire construction industry including prospective building clients.
  2. Assist designers in understanding the cost implication of design errors, so that they can make objective design decisions during the early phase of a project.
  3. Avail the designer with a tool for eradicating errors that are directly related to the designer that delay and or add cost to the project.

 

1.7 SCOPE OF STUDY

The study is on the investigation of the effect of design errors on the final cost of a project. It is narrowed down to building construction projects in Imo state of Nigeria.

1.8 LIMITATION OF THE STUDY

The only limitation faced by the researcher in the course of carrying out this study was the delay in getting data from the various respondents. Most respondents were reluctant in filling questionnaires administered to them due to their busy schedules and nature of their work. The researcher found it difficult to collect responses from the various respondents, and this almost hampered the success of this study.

1.9 DEFINITION OF TERMS

  • Design: The basic definition of design, according to Webster, is "the making of drawings or plans to plan and fashion the form and structure of an object to have intentions or purposes." The quality of planning and design is one of the primary factors of success in any project endeavour (Chalabi, Beaudin and Salazar, 1987). The design includes every aspect of the facility construction including operation and maintenance. The design incorporates a set of specifications to guide the contractor in developing his means and methods of construction.
  • Error: An error is defined, according to Webster, as "a deviation from accuracy or correctness; a mistake, as in action or procedure; an inaccuracy, as in speaking or writing." There are basically three types of errors: imperfections, non-conformance and omissions. Imperfections are deviations in details that have no affect on the assembly or facility (Davis and Ledbetter, 1987).
  • Design Error: From the evaluation above a simple definition of design error is "a deviation from the plans and specifications." It is not the intention of this definition to include any final cost or schedule growth or insinuate its root causes or legal responsibility. It is the responsibility of the owner, designer and contractor to establish the criteria in order to make a reasonable determination for responsibility. The survey shows a common theme, that of a mistake or error in the design. The survey also indicates several reasons why design errors exist and who cause them. This provides evidence that there is not a concise definition within the construction industry.
  • Contract:  Erikson (2002) defined Contract as an agreement that creates an obligation binding upon the parties thereto. The essentials of a contract are as follows: (1) mutual assent; (2) a legal consideration, which in most instances need not be pecuniary; (3) parties who have legal capacity to make a contract; (4) absence of fraud or duress; and (5) a subject matter that is not illegal or against public policy.
  • Contract Planning: According to Simmons (2007),Contract planning is the process of systematically and efficiently managing contract creation, execution and analysis for maximising operational and financial performance and minimising risk.
  • Contractor: General contractor, organization or individual that contracts with another organization or individual (the owner) for the construction of a building, road or other facility.
  • Profit:  Tucy (2008) defined profit as the difference between the purchase price and the initial costs of bringing to market.
  • Final Cost: final costare not fixed, expenses incurred on the purchase of land, buildings, construction, and equipment used in the production of goods or in the rendering of services. Put simply, it is the total final cost used to bring a project to a commercially operable status.

Get The Complete Project »

Project Department:

MORE ESTATE MANAGEMENT FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

Instantly Share this Project On Social Media:

CLOSELY RELATED ESTATE MANAGEMENT FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

CHALLENGES OF MANAGEMENT OF PUBLIC RESIDENTIAL PROPERTIES IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 79 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   13100 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Public residential property management is the operation, control, and oversight of real estate as used in its most broad terms. Management indi...Continue reading »

IMPACT OF REAL ESTATE SECTOR TO THE ECONOMIC GROWTH OF NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 70 ::   Attributes: Questionnaire, Data Analysis,Abstract

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY The Real Estate sector offers a great potential source of growth forNigeria. Until now, the understanding of its composition and growth has bee...Continue reading »

ROLE OF THE STATE GOVERNMENT IN THE DEVELOPMENT OF RESIDENTIAL ESTATES IN NIGERIA (A CASE STUDY OF OGUN STATE GOVERNMENT)

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4945 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Few residential estates built across Nigeria by both federal and state government has been able to meet the housing needs of many Nigerians. Sh...Continue reading »

ABUJA LAND AVAILABILITY CHALLENGES AND MISMANAGEMENT: ISSUES AND SOLUTIONS

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 70 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   3825 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Abuja the Federal Capital Territory of Nigeria has tremendous importance in the country's life and development.It is a hotbed for political...Continue reading »

EFFECT OF LANDLORD AND TENANT RELATIONSHIP ON RESIDENTIAL PROPERTY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   5687 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Maintaining healthy landlord-tenant relationship in a residential property is a pre-requisite for societal advancement and growth. Good tenant e...Continue reading »

ISSUES AND CHALLENGES IN THE EXECUTION OF PUBLIC SECTOR HOUSING PROJECTS IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 78 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   15147 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Housing (Shelter) is unarguably one of the basic necessities of man. It used to be ranked second after food in the hierarchy of man’s nee...Continue reading »

What are you looking for today?

TESTIMONIALS:

  • 1. Jayone from FPA said " I had a wonderful experience using UniProjectMaterials,though they did not deliver the material on time, but the content had good quality. I recommend UniProjectMaterials for any project research work.".
    Rating: Very Good
  • 2. Mugisha R from B.U, UGANDA said "Wow, this is great, your materials has helped me alot. Many blessings. I will inform my friends. Thanks. ".
    Rating: Very Good
  • 3. Nwachukwu Ruth Chinyerr from Michael okpara university of Agriculture,umudike said "I really appreciate this. Materials like this are good guides to writing a researchable project.".
    Rating: Good
  • 4. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 5. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 6. Mohammed A.B from Veterinary Laboratory, Zanzibar ,Tanzania said "You are doing good job to assists in research. God bless you.".
    Rating: Very Good

Paper Information

Format:ms word
Chapter:1-5
Pages:111
Attribute:Questionnaire, Data Analysis
Price:₦3,000
Get The Complete Project »

Best Selling Projects

Our Archives