THE IMPACT OF COST CONTROL TECHNIQUES ON CONSTRUCTION PROJECTS DELIVERY

Project Information:

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 73 ::   Attributes: Questionnaire, Data Analysis,Abstract ::   6,704 people found this useful

Project Body:

CHAPTER ONE

1.1 BACKGROUND OF THE STUDY

 It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the construction industry to national economic growth necessitates improved efficiency in the industry by means of cost effectiveness and timeliness, and would certainly contribute to cost savings for the country as a whole. It is also common knowledge that the implementation of the construction project in the industry is usually accompanied with time delay and cost increase as well as owner dissatisfaction (Hafez, 2001).

In general most (if not all), construction projects experience time delays and cost overruns during their implementation phase (Koushki and Kartam,2004). Numerous researchers, both in the developed and developing nations have also examined and identified the causes of time and cost overrun in the construction industry. Mansfield, Ugwu and Doran (1994), for example performed a comprehensive analysis of most important factors responsible for project delays and cost overrun in Nigerian construction projects. This analysis indicated poor contract management, financing and payment of completed works, change in site conditions, shortages of materials, design changes, subcontractors and nominated suppliers, other factors were price fluctuation inaccurate estimates, delays and additional works as factors responsible for project delays and cost overrun.

A comprehensive classification of causes of construction delays has also been determined by Henesy (1993). The classification system included materials, labour, equipment and financial constraints, as the main contributory variable to causes of construction time overrun. The list of major factors causing construction delay in Thailand by Ogunlana and Proumkunting (1996) included the inadequacy of resources supplies, client and consultant shortcomings and incompetence. Koushki and Kartan (2004) studied the impact of construction materials on project time and cost in Kuwait and identified the project related variable affecting the on time delivery of materials as material selection, time, type of materials and their availability in the local market.

 Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project.

 Time factors are inherent in all of project construction’s undertakings. Construction projects have long been recognized as particularly cost, time and risk-laden. Some of the time and cost factors associated with the construction process are fairly predictable or identifiable; others may be totally unforeseen. The constructed project may not perform as anticipated because the owner may have unrealistic expectations regarding the delivery time of construction forcing contractors into unrealistic gambles, corner-cutting or commitments that may not be realistic (Frimpong 2003).

 Project success can be defined as meeting goals and objectives as prescribed in the project plan. A successful project means that the project has accomplished its technical performance, maintained its schedule, and remained within budgetary costs. Project management tools and techniques play an important role in the effective management of a project. Therefore, a good project management lies in the management tools and techniques used to manage the project. Project management involves managing the resources—workers, machines, money, materials and methods used. Some projects are effectively and efficiently managed while others are mismanaged, incurring much delay and cost overruns and negatively affecting the economy (Frimpong 2003).

 Assessing construction projects’ delivery time is critical in today’s market-driven economy.

 

1.2 PROBLEM STATEMENT

 Construction can be considered as a dynamic industry which is constantly facing uncertainties. These uncertainties and the many stakeholders in these kinds of projects, make the management of costs difficult which consequently causes cost overruns. Therefore, cost overruns are considered one of the most critical issues during the execution of construction projects (Chan, et al., 2004; Doloi, 2011).

 As mentioned by Van Der Westhuizen and Fitzgerald (2005), the presence of cost overruns can be a reason for project delays or possible project failures. However this idea has been refuted by many authors who considered that project success depends on many other factors that should be assessed to conclude the success or failure of a project (Chan, et al., 2004). Moreover, there have been many studies that suggest that the success of a project depends on the presence of certain critical factors which can also change depending on the objective to be met (Iyer and Jha, 2005). In other words, some authors ascertained that there are some critical success factors that help to improve cost performance and prevent cost overruns.

1.3 OBJECTIVES OF THE STUDY

 The main aim of the study is to examine various cost control techniques used in construction projects and the impact they have on project delivery. Specific objectives of the study are:

To identify cost control technique frequently used by contractors in construction projects.

To examine problems encountered by contractors in managing construction project cost.

To determine the impact of costcontrol techniques on the duration of construction projects.

 

1.4 RESEARCH QUESTIONS

 In-order to guide the study and achieve the above stated research objectives; the following research questions were formulated:

What cost control techniques are frequently used by contractors in construction projects?

What are the problems faced by contractors in controlling cost in the construction project process?

What impact does cost controlling techniques have on the duration of construction projects?

 

1.5. RESEARCH HYPOTHESES

Ho: Cost control problems lead to project delivery failures.

Hi: Cost control problems do not lead to project delivery failures.

Ho: Cost Control techniques lead to construction delivery failures

Hi: Cost Control techniques do not lead to construction delivery failures

 

1.6 SIGNIFICANCE OF THE STUDY

 This study will be of importance to building professionals and the general public because it would not only clarify but also create awareness of the extent to which inadequacies in cost control techniques can adversely affect project performance. The study will also help contractors, clients, consultants and all parties involved in construction projects about ways of improving their current method of cost management and control.

 The study will also be of great benefit for other student researchers’ who may want to venture into the same subject matter. Having gotten results-both empirically and theoretically, the study will serve as a foundation for future research studies.

 

1.7 SCOPE OF THE STUDY

 The study will cover some selected quantity surveyors from Owerri. All findings and recommendations from the study may not reflect the true view of the traditional roles and changing roles of quantity surveyors as the researcher could not cover a wider area due to financial and time constraints.

 

1.8 DEFINITION OF TERMS

Construction: In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.

Deliverable: Deliverable is a term used in project management to describe a tangible or intangible object produced as a result of the project that is intended to be delivered to a customer (either internal or external). A deliverable could be a report, a document, a server upgrade or any other building block of an overall project.

Project management: this is the discipline of planning, organizing, motivating, and controlling resources to achieve specific goals. A project is a temporary endeavour with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables), undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value.

Time: This is a dimension in which events can be ordered from the past through the present into the future, and also the measure of durations of events and the intervals between them.

Cost: A cost is the value of money that has been used up to produce something, and hence is not available for use anymore. In business, the cost may be one of acquisition, in which case the amount of money expended to acquire it is counted as cost.

Cost overrun: occurs when the final cost of the project exceeds the original contract value at the time of completion.

Good cost performance project: Project in which the cost overrun of the project does not exceed 10 percent of the initial budget.

Poor cost performance project: Project in which the cost overrun of the project exceeds 10 percent of the initial budget.

 

REFERENCES

 Aibinu A.A and Jagboro G.O (2002): “The Effects of Construction

Delays on Projects Delivery in Nigeria Construction Industry”. International Journal of Project Management, 20, 593-599.

 Chan, A.P.C., Scott, D. and Chan, A.P.L. (2004). Factors affecting

 the success of a construction project. Journal of Construction Engineering and Management 130pp.

Frimpong, Y. (2003). Project management in developing countries:

 causes of delay and cost overruns in construction of groundwater projects. Unpublished Masters Research Project, University of Technology, Sydney, Australia.

Hafez, N (2001): “Residential Projects Obstacles and problems in

 Kuwait MS Project”, Department of Civil Engineering, Kuwait University.

Henesy, M. (1993): “Tools of Total Quality Management”. Journal of

 Construction Engineering and Management ASCE. Pg 9(4), 329-339

 Iyer, K.C. and Jha, K.N. (2005). Factors affecting cost performance:

 evidence from Indian construction projects. International Journal of Project Management 23(4), pp. 283-

Koushki, P.A and Kartan, N. (2004): “Impact of Construction

Materials on Project Time and Cost in Kuwait, 11 (2), 123-132.

 Ugwu et al (1994): “Concurrent Delays in Construction Projects”.

 Journal of Construction Engineering and Management, 113 (4), 691 –602


Get The Complete Project »

Project Department:

MORE QUANTITY SURVEYING FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

Instantly Share this Project On Social Media:

CLOSELY RELATED QUANTITY SURVEYING FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

AN INVESTIGATION INTO RISK MANAGEMENT PRACTICES AMONGST QUANTITY SURVEYORS IN THE CONSTRUCTION INDUSTRY OF NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 67 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4722 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Quantity surveying is concerned with controlling and managing construction projects. The Nigerian construction industry is faced with uncertainti...Continue reading »

ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 71 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   3775 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Until relatively recently, the discipline of development appraisal has remained the provenance of surveyors and developers. It largely been ignor...Continue reading »

ASSESSMENT OF FACTORS AFFECTING CONTRACTORS TENDER FOR CONSTRUCTION PROJECTS IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4915 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contrac...Continue reading »

THE EFFECT OF MOTIVATION OF LABOUR, COST AND PRODUCTIVITY ON NIGERIAN CONSTRUCTION INDUSTRY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 74 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4009 engagements

CHAPTER ONE 1.1 BACKGROUND TO THE STUDY Human resource management is of strategic importance when it comes to industries that are labour intensive like construction industry. The effective management...Continue reading »

THE EFFECT OF TIMELY DELIVERY OF CONSTRUCTION PROJECTS ON THE ECONOMIC DEVELOPMENT OF NIGERIA ( A CASE STUDY OF SOME SELECTED PROJECT SUPERVISORS IN JULIUS BEGER PLC AND MARLUM CONSTRUCTION COMPANY)

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 70 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   3386 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and m...Continue reading »

THE IMPACT OF PROCUREMENT SYSTEMS ON CONSTRUCTION COST AND DELIVERY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 79 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4616 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The construction industry is an importan t part of the economical backbone in many countries (Ngai et al., 2002), often accounting for between 7-...Continue reading »

What are you looking for today?

TESTIMONIALS:

  • 1. Jayone from FPA said " I had a wonderful experience using UniProjectMaterials,though they did not deliver the material on time, but the content had good quality. I recommend UniProjectMaterials for any project research work.".
    Rating: Very Good
  • 2. Mugisha R from B.U, UGANDA said "Wow, this is great, your materials has helped me alot. Many blessings. I will inform my friends. Thanks. ".
    Rating: Very Good
  • 3. Nwachukwu Ruth Chinyerr from Michael okpara university of Agriculture,umudike said "I really appreciate this. Materials like this are good guides to writing a researchable project.".
    Rating: Good
  • 4. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 5. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 6. Mohammed A.B from Veterinary Laboratory, Zanzibar ,Tanzania said "You are doing good job to assists in research. God bless you.".
    Rating: Very Good

Paper Information

Format:MS word
Chapter:1-5
Pages:73
Attribute:Questionnaire, Data Analysis,Abstract
Price:₦3,000
Get The Complete Project »

Best Selling Projects

Our Archives